PHOTOS: Latest Construction Update on Remy’s Ratatouille Adventure (Gusteau’s Sign, New Bathrooms, La Creperie) in the France Pavilion at EPCOT

Iain

PHOTOS: Latest Construction Update on Remy’s Ratatouille Adventure (Gusteau’s Sign, New Bathrooms, La Creperie) in the France Pavilion at EPCOT

Today, we stopped by France in EPCOT to see the latest on the pavilion’s expansion.

EPCOT France Construction 1 14 20 Water work.jpg?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

At the water’s edge, work was being performed on some lighting and electrical work for the pavilion.

EPCOT France Construction 1 14 20 Painted walls.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

We also noticed the entire side of the building guests will walk past en route to the new expanded area has been painted yellow.

EPCOT France Construction 1 14 20 Walkway.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

From above, we can see that mostly pathway work remains, as well as some landscaping work.

EPCOT France Construction 1 14 20 guseau sign.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

As we reported yesterday, the new Gusteau’s sign is in place and clearly visible to guests.

EPCOT France Construction 1 14 20 facades.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

The sign will blend in nicely with the facades behind it.

EPCOT France Construction 1 14 20 le creperie.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

Work on La Creperie de Paris continues to ramp up as scaffolding and scrim now cover the entire outside of the building.

EPCOT France Construction 1 14 20 restroom side.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

EPCOT France Construction 1 14 20 restrooms.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

Work on painting the outside of the restroom building is also nearing completion.

EPCOT France Construction 1 14 20 fountain.jpg?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

EPCOT France Construction 1 14 20 Courtyard.jpg?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

There has been little visible change to the fountain that will be located outside of the entrance to Remy’s Ratatouille Adventure.

EPCOT France Construction 1 14 20 metal work.JPG?auto=compress%2Cformat&fit=scale&h=667&ixlib=php 1.2

That wraps up our visit to EPCOT’s France pavilion. Are you looking forward to experiencing this new area? Let us know in the comments below.