Grand Floridian Lobby Staircase Blocked, Convention Center Roof Under Construction

Shannen Ace

Published:

Scaffolding and construction barriers inside a large, high-ceilinged room with cream-colored walls and decorative lights.

Grand Floridian Lobby Staircase Blocked, Convention Center Roof Under Construction

The grand staircase in the lobby of Disney’s Grand Floridian Resort is now blocked for construction.

Birdcage Bar

Grand Floridian lobby area with ornate decor; central section under construction with workers and equipment behind temporary walls.

Several crew members were situated around the birdcage bar site on Wednesday morning, and two lifts had been moved into the area. In our last few updates, the bar got a concrete foundation added in the former birdcage area.

The crew appeared to be discussing plans. The foundation itself doesn’t look too different from our previous update. However, the nearby lifts mean crews are gearing up to do some hard-to-reach construction work.

PhotoPass Area

White construction partitions block off a section of a building interior with visible framework behind them.

The PhotoPass area next to M. Mouse Mercantile is still blocked off, but we can see a steel framework against the wall. This wall used to hold backdrops and curtains. Light fixtures on the nearby columns are wrapped in plastic to keep them protected from construction.

Grand Staircase

A woman stands near a roped-off staircase in the lobby of the Grand Floridian, which shows signs of renovation.

The grand staircase facing the center elevators is now closed. Stanchions and construction walls block access at the bottom of the stairs. White curtains block access to the staircase on the second floor.

Scaffolding and construction barriers inside a large, high-ceilinged room with cream-colored walls and decorative lights.

Visible behind the walls is scaffolding, reaching up to the ceiling and covering a window mural located above the landing.

A staircase closed off by barriers and construction walls inside the Grand Floridian lobby.

Another set of white curtains blocks the hallway to the left side of the stairs.

Convention Center Roof Work

Outside, we caught sight of roof work underway on the resort’s convention center. Crew members in a lift were working atop one of the building’s towers.

More crew members were working on a low section of the building. Shingles are gone from two layers of roof, and the crew were in the process of removing shingles from another layer.

Disney indicated earlier this year that the convention center would be updated alongside the lobby’s transformation.

What do you think of all the ongoing construction at Disney’s Grand Floridian Resort? Let us know in the comments and on social media.

For the latest Disney Parks news and info, follow WDW News Today on TwitterFacebook, and Instagram.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.