PHOTOS: Latest Construction Progress on Space 220 Restaurant at Epcot

Derek Sterling

PHOTOS: Latest Construction Progress on Space 220 Restaurant at Epcot

Derek Sterling

PHOTOS: Latest Construction Progress on Space 220 Restaurant at Epcot

Today we come to you with a construction update from Space 220 in Epcot’s Future World. This restaurant was recently named at the D23 Expo and will open this winter.

Let’s take a look!

86218593 94D4 49B3 8B6D CF713FE59F48 387D58B5 8655 4E8A 896F 5EB168F02983

Approaching from the loop on Test Track, we see that the outside of the building is getting primed for themed siding.

8DC66742 96CF 4D7D 9190 9EEBA19B17CF 6E5E92A4 8060 4E8C 8BE1 16620F641E3E D56F81BC 1E1F 40FE A6A9 CDD02B28C3B4 DF697DDC 7C31 44F3 AE6E 4F55F9566B1E

The previous hole in the building for large equipment and people to use to get into the building has been sealed up. The wall looks permanent as well, which is interesting to note.

59520050 01AB 434B 884E D6C059EFA9F1 386BD15C B3BE 4458 B2DE BC954B18F7D4

Painting is also being done on the building as they attempt to theme it to match the surrounding area. While we don’t know the exact color scheme, a similar look to the adjacent Mission: Space building would make sense.

Stay tuned to WDWNT for updates on Space 220!

2 thoughts on “PHOTOS: Latest Construction Progress on Space 220 Restaurant at Epcot”

  1. Just want to thank you once again for all the great info and photos you put out there for all of us to enjoy!

Comments are closed.