The construction walls that went up near Fairytale Garden at Magic Kingdom last month have been removed, revealing fresh concrete.
Magic Kingdom Pavement Work
Rolling planters still block part of the area between Mirabel’s meet and greet and Cheshire Cafe. All the offerings in the area remain open during this construction.
A fresh patch of concrete pavement is open where the construction walls used to be.


There are some messy lines where the new pavement meets the old. The new concrete is darker than the old faded pavement.
Behind the planters, we could see that more of the walkway has been torn up and is yet to be replaced.
Another fresh patch of concrete is on the other side of the planters, in front of Fairytale Garden.
Like the other patch, this one has some messy edges.
With ongoing concrete replacement, these edges will likely be cleaned up.
With near-constant foot traffic (and parade traffic in certain areas), pavement throughout the parks has to be replaced every once in a while. Late last year, crews installed new themed pavement in Adventureland. Bricks were recently replaced at the main entrance of Liberty Square.
For the latest Disney Parks news and info, follow WDW News Today on Twitter, Facebook, and Instagram.