PHOTOS: Construction Walls Installed Along Exit for “it’s a small world” at the Magic Kingdom

Shannen Ace

small-world-construction-walls-sept-2020_2

PHOTOS: Construction Walls Installed Along Exit for “it’s a small world” at the Magic Kingdom

Shannen Ace

small-world-construction-walls-sept-2020_2

PHOTOS: Construction Walls Installed Along Exit for “it’s a small world” at the Magic Kingdom

Construction walls have been added to the exterior of “it’s a small world.” This comes just after Walt Disney Imagineering filed a permit for graphic installation at the attraction.

small-world-construction-walls-sept-2020_1

The walls are on the righthand side of the attraction’s facade, where the attraction exits. This is also where the entrance to the attraction was until 2005.

small-world-construction-walls-sept-2020_10

It’s possible the entrance is being moved back in time for the park’s 50th anniversary next year.

small-world-construction-walls-sept-2020_2

It’s also possible that crowding at the current entrance necessitates going back to the old one. Or this may just be a refurbishment and the entrance won’t be switched at all.

small-world-construction-walls-sept-2020_9
small-world-construction-walls-sept-2020_8
small-world-construction-walls-sept-2020_7

The queue for “it’s a small world” was recently refurbished, and Plexiglass barriers were later added due to the COVID-19 pandemic.

small-world-construction-walls-sept-2020_6
small-world-construction-walls-sept-2020_5
small-world-construction-walls-sept-2020_4
small-world-construction-walls-sept-2020_3

We will continue to post updates about construction at “it’s a small world”, so keep checking WDWNT.com.